plop SPACEPHOTOS
 Untitled Document




   Home » Ref S13520 (detail)

 
My Light Box / Estimate Request : 0 image(s)
Alternate choice of images for this theme
                        
Save this image free of charge
in 800 pixels for layout use
(right click, Save as...)



Ref : S13520

Theme : Testings - Satellites - Probes - Rockets  (2314 images)

Title : Inside the Operations and Checkout Bldg. (O&C)

Caption :

(06/12/1999) -- Inside the Operations and Checkout Bldg. (O&C), an overhead crane removes the cover from the S0 truss segment beneath it. The S0 truss will undergo processing in the O&C during which the Canadian Mobile Transporter, power distribution system modules, a heat pipe radiator for cooling, computers, and a pair of rate gyroscopes will be installed. Four Global Positioning System antennas are already installed. A 44by 15-foot structure weighing 30,800 pounds when fully outfitted and ready for launch, the truss will be at the center of the ISS 10-truss, girderlike structure that will ultimately extend the length of a football field. Eventually the S0 truss will be attached to the U.S. Lab, 'Destiny,' which is scheduled to be added to the ISS in April 2000. Later, other trusses will be attached to the S0 on-orbit. The S0 truss is scheduled to be launched in the first quarter of 2001 on mission STS-108